![]() Hopefully you measured twice so that all you need to do is cut your supports to the right height and maybe drill some new holes for the bolts. If you do place the wood support in the concrete, then at least make sure the concrete comes above ground level and slopes away from the wood on all sides.įinally, reinstall your stairs. The tight space blocks air flow and keeps the wood damp, leading to rot and decay. ![]() The water leaking down saturates the wood between the tongue and groove. Instead, use a concrete repair mix these are readily available at home centers and. During the winter months, blowing snow sits on top of the porch, then on slightly warmer days it melts and leaks into the basement. Concrete surfaces cannot be repaired with concrete. Make sure the bracket is above ground (my neighbor buried his and has all kinds of moisture issues). STEP 1: Choose your concrete repair product. I like the idea of metal brackets in the cement that keep the wood out of contact with the ground, rather than embedding the post in the cement itself, but only if you have a vertical load and no shear or twisting forces (e.g. Dig a hole 6 inches deep and pour drainage. Next you want to measure out where you’re going to put the 4-way deck blocks. Fill the bottom with gravel and pour your cement. 2圆s 8 feet long (for joists and decking boards) 2x10s 8 feet long for fascia (the ones listed are 16 ft long so they could be cut in half) drainage rock. Set Project Zip Code Enter the Zip Code for the location where labor is hired and materials purchased. Actual costs will depend on job size, conditions, and options. Before removing the stairs, make sure to mark the location for the center of your cement pours using stakes about 4' away in two directions (one to the side, and one straight out to the yard, so that with a couple tape measures you can locate the exact spot).įor the hole, make it deep enough to get below the frost line in your location. For a basic project in zip code 47474 with 120 square feet, the cost to Repair Concrete starts at 12.49 - 14.82 per square foot. Depending on how it's attached (I've only done interior stairs where ground movement wouldn't be an issue) you may be able to detach it from the deck, remove any bolts holding it to the supports, and take it out in one piece. Next, I'm going to suggest ignoring the premise of the question and you remove the stairs to fix this. )įirst things first, Tester is right, don't pay the contractor until you get the permit, and force them to fix their mistakes at their own cost (regardless of whether you paid them or not). ![]() A typical deck pier footing that might be specified by an architect or engineer might be 20 or 24 inches in diameter. Please refer to the TuffBlock installation guide and your material supplier to ensure correct spacing is maintained for structural integrity.( Note: I see your comment that this is no longer an issue, but since the question is still opened and unanswered, I'll put something down here to get it off of our list and possibly help someone else with a similar issue. Get free shipping on qualified Deck Block Cinder Blocks products or Buy Online Pick Up in Store today in the Building Materials Department. A concrete deck block can support quite a bit of weight as it normally has a footprint of 12 x 12 inches. The above measurements are a basic guide only. As an example, a low level 10 x 10 feet deck would require bearers to be supported say every 4' 11", bearers would be spaced every 4' 11" to support the joists, so 3 x TuffBlocks per bearer. If you intend on using bearers on top of TuffBlocks, joists on top of bearers, and then decking or finishing material/sheeting – less TuffBlocks will be required. it is recommended that some decking lumber be spaced at 17" centres, it is always best to check with your lumber/material supplier for material specific recommendations).Īs an example, a low level deck 10 x 10 feet would require 21 TuffBlocks for the above configuration – that is 3 x TuffBlocks per 10 foot joist, 7 x joists spaced 17" apart. 1 Minimum Footing Size for Decks and it makes sizing concrete footings for a deck simple. Joists will need to be spaced at a distance appropriate to the finishing material (e.g. As a general rule, if you are supporting joists directly on TuffBlocks, you will need to support joists with a TuffBlock at 4' 11" intervals. It is completely dependent on the project but we recommend using our TuffBlock Calculator found on our product page.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |